2025 BMW M4 COMPETITION
$76,998

'' MUST CALL AHAED FOR AVAILABILITY 717 625 4444
VEHICLE FEATURES Brooklyn Grey Metallic Fjord Blue/Black Extended Meri Included
Parking Assistance Package
- Parking Assistant Plus
Executive Package
- Heated Steering Wheel
- BMW Curved Display with HUD
- Remote Engine Start
19/20'' M Dual-Spoke Bicolor Fo Included
M Sport Differential Included
Mobility Kit Included
Adaptive M Suspension Included
M Shadowline Lights
Moonlight Black soft top Included
Convertible Wind Deflector Included
M Seat Belts Included
Carbon Fiber trim
Neck Warmer
SensaTec Dashboard
Galvanic controls
Auto-dimming interior and exte Included
Auto-dimming rearview mirror Included
Front ventilated seats
Lumbar support Included
Heated front seats Included
Active Driving Assistant Included
Active Guard Included
Dual Zone Auto Climate Control Included
Full LED Headlights w/ Laserli Included
BMW Assist eCall Included
BMW TeleServices Included
ConnectedDrive Services Included
Connected Package Pro Limited Included
Drive Recorder
Wireless Device Charging Included
SiriusXM w/ 360L
Harman Kardon surround sound s Included
Extended Shadowline Trim Included
M Sport Seats Included
Shadowline exterior trim Included
Anthracite headliner Included
Refrigerant Included
Control D Included
Black All Weather Floor Mats
BMW First Aid Kit
Wheel LocksPerformance and efficiency
3.0-liter BMW M TwinPower Turbo inline 6-cylinder engine with
variable valve control (Double-VANOS and Valvetronic) and
high-precision direct injection
8-speed M STEPTRONIC automatic transmission with Drivelogic
Handling, ride and braking
M Drive and M Driving Dynamics Control
Adaptive M Suspension
M Compound 4-wheel ventilated anti-lock disc brakes (ABS) with
Dynamic Brake Control (DBC) and Cornering Brake Control (CBC)
M Sport Differential
xDrive all-wheel drive system
Connectivity
Personal eSIM with 5G connectivity
ConnectedDrive Services with My BMW App
Wireless Device Charging
Apple CarPlay and Android Auto compatibility
Remote Software Upgrade capable
Exterior
Shadowline exterior trim
Extended shadowline exterior trim
Audio system
Harman Kardon Surround Sound Audio System
SiriusXM with 360L
PLEASE CALL AHEAD FOR DETAILS, PLEASE CALL 717-625-4444 FOR ANY DETAILS OR QUESTIONS OR STOP BY OUR FAMILY OWNED DEALERSHIP IN LITITZ PA FOR A TEST DRIVE.
VEHICLE FEATURES Brooklyn Grey Metallic Fjord Blue/Black Extended Meri Included
Parking Assistance Package
- Parking Assistant Plus
Executive Package
- Heated Steering Wheel
- BMW Curved Display with HUD
- Remote Engine Start
19/20'' M Dual-Spoke Bicolor Fo Included
M Sport Differential Included
Mobility Kit Included
Adaptive M Suspension Included
M Shadowline Lights
Moonlight Black soft top Included
Convertible Wind Deflector Included
M Seat Belts Included
Carbon Fiber trim
Neck Warmer
SensaTec Dashboard
Galvanic controls
Auto-dimming interior and exte Included
Auto-dimming rearview mirror Included
Front ventilated seats
Lumbar support Included
Heated front seats Included
Active Driving Assistant Included
Active Guard Included
Dual Zone Auto Climate Control Included
Full LED Headlights w/ Laserli Included
BMW Assist eCall Included
BMW TeleServices Included
ConnectedDrive Services Included
Connected Package Pro Limited Included
Drive Recorder
Wireless Device Charging Included
SiriusXM w/ 360L
Harman Kardon surround sound s Included
Extended Shadowline Trim Included
M Sport Seats Included
Shadowline exterior trim Included
Anthracite headliner Included
Refrigerant Included
Control D Included
Black All Weather Floor Mats
BMW First Aid Kit
Wheel LocksPerformance and efficiency
3.0-liter BMW M TwinPower Turbo inline 6-cylinder engine with
variable valve control (Double-VANOS and Valvetronic) and
high-precision direct injection
8-speed M STEPTRONIC automatic transmission with Drivelogic
Handling, ride and braking
M Drive and M Driving Dynamics Control
Adaptive M Suspension
M Compound 4-wheel ventilated anti-lock disc brakes (ABS) with
Dynamic Brake Control (DBC) and Cornering Brake Control (CBC)
M Sport Differential
xDrive all-wheel drive system
Connectivity
Personal eSIM with 5G connectivity
ConnectedDrive Services with My BMW App
Wireless Device Charging
Apple CarPlay and Android Auto compatibility
Remote Software Upgrade capable
Exterior
Shadowline exterior trim
Extended shadowline exterior trim
Audio system
Harman Kardon Surround Sound Audio System
SiriusXM with 360L
PLEASE CALL AHEAD FOR DETAILS, PLEASE CALL 717-625-4444 FOR ANY DETAILS OR QUESTIONS OR STOP BY OUR FAMILY OWNED DEALERSHIP IN LITITZ PA FOR A TEST DRIVE.
- 360-Degree Camera
- ABS (4-Wheel)
- AM/FM Stereo
- Active Belts
- Air Conditioning
- Air bag
- Alloy Wheels
- Android Auto
- Anti-lock Brakes
- Apple CarPlay
- Auto-Reverse System for Windows and Sunroofs
- Automatic Emergency Braking
- Automatic High Beams
- Backup Camera
- Backup Sensors
- Blind Spot Warning (BSW)
- Bluetooth
- Convertible
- Crash Imminent Braking (CIB)
- Cruise Control
- Daytime Running Light (DRL)
- Daytime Running Lights
- Dual Air Bags
- Dual Power Seats
- Dual Rear Side Air Bags
- Dual-Zone Automatic Climate
- Dynamic Brake Support (DBS)
- Electronic Stability Control (ESC)
- Forward Collision Warning (FCW)
- Heated Seats
- Immobilizer / keyless entry / and alarm
- Keyless Ignition
- Lane Departure Warning (LDW)
- Lane-Keeping Assist
- Leather
- Navigation
- Parking Assist
- Pedestrian Automatic Emergency Braking (PAEB)
- Power Brakes
- Power Locks
- Power Seat
- Power Steering
- Power Windows
- Premium Sound
- Rear Air Bags
- Rear Automatic Emergency Braking
- Rear Defroster
- Rear Head Air Bags
- Rear Heated Seats
- Remote Trunk
- Satalite Radio
- Semiautomatic Headlamp Beam Switching
- Side Air Bags
- Signal Mirrors
- Tilt Steering Wheel
- Traction Control
- Trip/Mileage Computer
- Turbocharger
- USB PORT
$76,998
Mileage:
7,276 Miles
Type:
Car
Body style:
convertible
Exterior:
gray
Interior:
blue
Engine:
Gas 3.0L 6 cylinder
Transmission:
8 speed automatic
Drive Type:
All Wheel Drive
Stock:
T41642
VIN:
WBS43BA04SCT41642
























